Before, during, after: each series follows one of our jobs, photographed on site.
Before Old liner, rusted walls and green water.During The old liner is out: the structure is bare.After New liner installed. Same pool, same backyard.Other angle The same new liner, seen from the other side.
Same pool from start to finish
1 / 4
Liner replacement on a freeform pool
During Liner removed and pool floor prepared.After New liner installed on the same pool.
Same pool from start to finish
1 / 2
Liner replacement on a rectangular pool
During The old liner is out: bare walls and floor.After New liner installed on the same pool, before filling.
Same pool from start to finish
1 / 2
Liner replacement on a pool with a paver deck
Located The leak location is marked on the deck.Opened The concrete is opened right above it.Leak The leak is found on the plumbing.Repair The plumbing is repaired.Finish The concrete is patched.
One job, step by step
1 / 5
Repairing a leak under the concrete deck
Pool closing
What a closing actually involves
Three steps, done in order, so your pool gets through the winter with no bad surprise in the spring.
Our experience spans the pool industry, from high-end construction to maintenance. We give you the price and schedule your visit ourselves, with no middleman.
In-ground poolsOur specialty: openings, closings, liners, leaks and repairs.
Launch pricingA new business, with prices set to build a client base.
Montreal and South Shore tooWe also travel further from Laval, and we confirm the price before the visit.
As soon as the ice is gone for good, sometimes as early as mid-April depending on the region.
Ideally, according to CAA-Québec: open before the water reaches 21 °C (70 °F), to limit algae.
Closing
CAA-Québec calls October the ideal month. Quebec pool retailers advise closing as late as possible, just before the first frost: end of October, or early November in southern Quebec.
The benchmark: water below 10 °C (50 °F), which slows algae and keeps the water clear until spring.
We specialize in in-ground pools: openings, closings, liners, leaks and repairs. For an above-ground pool, give us a call: we will tell you if we can help.
How is the price calculated?
The prices shown are our base prices, in Laval. The further away you are, the higher the travel fee. We confirm the price before the visit.
Do you go to Montreal and the South Shore?
Yes, gladly! We also serve Montreal and the South Shore. A travel fee may apply depending on the distance.
What is a turnkey opening?
We fully drain your pool, then clean it thoroughly. Once the pool is clean, we wait for it to be filled, then come back to start your equipment back up.
My pool is losing water. Where do I start?
Start by calling us. With our experience, we can very often tell over the phone whether the leak is in the liner or the plumbing. Then we book the right appointment to find the exact spot.
When should I close my pool?
CAA-Québec calls October the ideal month. Quebec pool retailers advise waiting until the water is below 10 °C (50 °F), just before the first frost: end of October, or early November in southern Quebec.
Are you available on weekends?
Yes. We work 7 days a week, weekends included.
Free quote
One minute, and we call you back.
Tell us what you need, where your pool is and when you are available. We call you back to confirm the price and the date.